Wednesday, January 21, 2015

Phase 2: Pressure Drop Verification Calculation

One of the biggest goals of the project was measuring the pressure drop across the pipe bank. To do this, we needed to prove to ourselves that there was going to be a pressure drop and it could easily be measured using pressure taps.

No comments:

Post a Comment